Difference between revisions of "Process Steps"
From TrueERP wiki
Line 23: | Line 23: | ||
'''How to use Process Steps''' | '''How to use Process Steps''' | ||
− | *Select the Manufacturing tab | + | *Select the [[Manufacturing]] tab |
− | *Select the Process Steps button | + | *Select the [[Process Steps]] button |
*The Process Steps screen will load display a list of all current Active and Inactive Process Steps. | *The Process Steps screen will load display a list of all current Active and Inactive Process Steps. |
Revision as of 12:09, 10 March 2011
Overview
Process Steps are the preliminary foundation steps to manufacturing a product. Process Steps are used to identify the action required at a set stage in an assembly. Processes Steps are the steps listed in the assemply schedule and are allocated a period of time for completion. Each process step will be allocated to a <a _fcknotitle="true" href="Resource">Resource</a>
How to use Process Steps
- Select the Manufacturing tab
- Select the Process Steps button
- The Process Steps screen will load display a list of all current Active and Inactive Process Steps.
- Enter a new Process Step by selecting the last entered row and using the down arrow on your keyboard to create
a new line.
- Enter the name of your new Process Step, e.g. 'Packing'.
- Tick the Active box to ensure it will be available for selection when creating an Assembly.
- Select 'OK' to save your new entry.
Process Steps are an integral part of setting up a Manufactured Product within Inventory. Please refer to New <a _fcknotitle="true" href="Product / Manufacturing">Product / Manufacturing</a> Tab for details on setting up a Manufactured product.