Personal tools

Difference between revisions of "18 Assigning Steps"

From TrueERP wiki

Jump to: navigation, search
(Created page with "Assigning Steps How do you add a Process_Step<LinkId=973> to a sub-branch? Each item in a BOM must have its own branch with its own process steps and input types. A branch can ...")
(No difference)

Revision as of 14:20, 29 June 2011

Assigning Steps

How do you add a Process_Step<LinkId=973> to a sub-branch?

Each item in a BOM must have its own branch with its own process steps and input types. A branch can be off the main tree or it can be a branch off a branch (sub-branch).

How to add a Process Step

Select Inventory Select Product Select Manufacturing Select the Process Steps field in the sub-branch Select a Process Step from the drop down list Enter the Duration<LinkId=984> or time required for the step as well as any setup and breakdown time Enter the Sequence<LinkId=985> number if more than one step (if not leave the default value)