(Created page with "Assigning Steps How do you add a Process_Step<LinkId=973> to a sub-branch? Each item in a BOM must have its own branch with its own process steps and input types. A branch can ...")
 
 
Line 1: Line 1:
Assigning Steps
+
'''Assigning Steps'''
  
How do you add a Process_Step<LinkId=973> to a sub-branch?
+
How do you add a '''Process Step''' to a '''Sub-Branch?'''
  
Each item in a BOM must have its own branch with its own process steps and input types. A branch can be off the
+
Each item in a '''BOM''' must have its own branch with its own process steps and input types. A branch can be off the main tree or it can be a branch off a branch ('''sub-branch''')
main tree or it can be a branch off a branch (sub-branch).
+
  
How to add a Process Step
+
*To Add a '''Process Step''' select the '''Manufacturing''' Tab
 
+
*Select the'''Process Steps''' field in the '''Sub-Branch'''
Select Inventory
+
*Select a '''Process Step''' from the drop down list  
Select Product
+
*Enter the '''Duration''' or time required for the step as well as any '''Setup''' and '''Breakdown''' time  
Select Manufacturing
+
*Enter the '''Sequence Number''' if more than one step or if not leave the '''Default''' value
Select the Process Steps field in the sub-branch
+
Select a Process Step from the drop down list
+
Enter the Duration<LinkId=984> or time required for the step as well as any setup and breakdown time
+
Enter the Sequence<LinkId=985> number if more than one step (if not leave the default value)
+

Latest revision as of 14:16, 2 December 2011

Assigning Steps

How do you add a Process Step to a Sub-Branch?

Each item in a BOM must have its own branch with its own process steps and input types. A branch can be off the main tree or it can be a branch off a branch (sub-branch)

  • To Add a Process Step select the Manufacturing Tab
  • Select theProcess Steps field in the Sub-Branch
  • Select a Process Step from the drop down list
  • Enter the Duration or time required for the step as well as any Setup and Breakdown time
  • Enter the Sequence Number if more than one step or if not leave the Default value