Difference between revisions of "Process Steps"
From TrueERP wiki
(Created page with "<menu name=myMenu align=center> More Detail= Barcode Manufacturing Capacity Planning Job Time Sheets Manufacture Product List Manufacturing Reports [[Orders F...") |
|||
Line 16: | Line 16: | ||
[[Resource Unavailability]] | [[Resource Unavailability]] | ||
</menu> | </menu> | ||
− | == | + | <h2> Overview </h2> |
+ | <p>Process Steps are the preliminary foundation steps to manufacturing a product. Process Steps are used to identify | ||
+ | the action required at a set stage in an assembly. Processes Steps are the steps listed in the assemply schedule | ||
+ | and are allocated a period of time for completion. Each process step will be allocated to a <a _fcknotitle="true" href="Resource">Resource</a> | ||
+ | </p><p><b>How to use Process Steps</b> | ||
+ | </p> | ||
+ | <ul><li>Select the Manufacturing tab | ||
+ | </li><li>Select the Process Steps button | ||
+ | </li></ul> | ||
+ | <ul><li>The Process Steps screen will load display a list of all current Active and Inactive Process Steps. | ||
+ | </li></ul> | ||
+ | <ul><li>Enter a new Process Step by selecting the last entered row and using the down arrow on your keyboard to create | ||
+ | </li></ul> | ||
+ | <p> a new line. | ||
+ | </p> | ||
+ | <ul><li>Enter the name of your new Process Step, e.g. 'Packing'. | ||
+ | </li><li>Tick the Active box to ensure it will be available for selection when creating an Assembly. | ||
+ | </li><li>Select 'OK' to save your new entry. | ||
+ | </li></ul> | ||
+ | <p>Process Steps are an integral part of setting up a Manufactured Product within Inventory. Please refer to New | ||
+ | <a _fcknotitle="true" href="Product / Manufacturing">Product / Manufacturing</a> | ||
+ | Tab for details on setting up a Manufactured product. | ||
+ | </p> |
Revision as of 12:55, 2 March 2011
Overview
Process Steps are the preliminary foundation steps to manufacturing a product. Process Steps are used to identify the action required at a set stage in an assembly. Processes Steps are the steps listed in the assemply schedule and are allocated a period of time for completion. Each process step will be allocated to a <a _fcknotitle="true" href="Resource">Resource</a>
How to use Process Steps
- Select the Manufacturing tab
- Select the Process Steps button
- The Process Steps screen will load display a list of all current Active and Inactive Process Steps.
- Enter a new Process Step by selecting the last entered row and using the down arrow on your keyboard to create
a new line.
- Enter the name of your new Process Step, e.g. 'Packing'.
- Tick the Active box to ensure it will be available for selection when creating an Assembly.
- Select 'OK' to save your new entry.
Process Steps are an integral part of setting up a Manufactured Product within Inventory. Please refer to New <a _fcknotitle="true" href="Product / Manufacturing">Product / Manufacturing</a> Tab for details on setting up a Manufactured product.