Difference between revisions of "18 Assigning Steps"
From TrueERP wiki
Simon Clive (Talk | contribs) (Created page with "Assigning Steps How do you add a Process_Step<LinkId=973> to a sub-branch? Each item in a BOM must have its own branch with its own process steps and input types. A branch can ...") |
Simon Clive (Talk | contribs) |
||
Line 1: | Line 1: | ||
− | Assigning Steps | + | '''Assigning Steps''' |
− | How do you add a | + | How do you add a '''Process Step''' to a '''Sub-Branch?''' |
− | Each item in a BOM must have its own branch with its own process steps and input types. A branch can be off the | + | Each item in a '''BOM''' must have its own branch with its own process steps and input types. A branch can be off the main tree or it can be a branch off a branch ('''sub-branch''') |
− | main tree or it can be a branch off a branch (sub-branch) | + | |
− | + | *To Add a '''Process Step''' select the '''Manufacturing''' Tab | |
− | + | *Select the'''Process Steps''' field in the '''Sub-Branch''' | |
− | + | *Select a '''Process Step''' from the drop down list | |
− | + | *Enter the '''Duration''' or time required for the step as well as any '''Setup''' and '''Breakdown''' time | |
− | + | *Enter the '''Sequence Number''' if more than one step or if not leave the '''Default''' value | |
− | Select the Process Steps field in the | + | |
− | Select a Process Step from the drop down list | + | |
− | Enter the Duration | + | |
− | Enter the Sequence | + |
Latest revision as of 14:16, 2 December 2011
Assigning Steps
How do you add a Process Step to a Sub-Branch?
Each item in a BOM must have its own branch with its own process steps and input types. A branch can be off the main tree or it can be a branch off a branch (sub-branch)
- To Add a Process Step select the Manufacturing Tab
- Select theProcess Steps field in the Sub-Branch
- Select a Process Step from the drop down list
- Enter the Duration or time required for the step as well as any Setup and Breakdown time
- Enter the Sequence Number if more than one step or if not leave the Default value