Personal tools

14 Must Have Process

From TrueERP wiki

Revision as of 15:17, 29 June 2011 by Simon Clive (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Must Have Processes

Which line must always have a Process assigned to it?

The Bill of Materials is a tree structure with a branch or sub-branch for each component or value that makes up the product. You have to DO SOMETHING to the components that make up the BOM in order for it to produce the product so at a minimum you must have a process in the first line. That process will be assembly.

How to add a process

Select Inventory Select Product Select Manufacture Tab Add a process step to the top line (assembly) by clicking in the Process Steps column and selecting the Assembly process