Personal tools

18 Assigning Steps

From TrueERP wiki

Revision as of 14:16, 2 December 2011 by Simon Clive (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Assigning Steps

How do you add a Process Step to a Sub-Branch?

Each item in a BOM must have its own branch with its own process steps and input types. A branch can be off the main tree or it can be a branch off a branch (sub-branch)

  • To Add a Process Step select the Manufacturing Tab
  • Select theProcess Steps field in the Sub-Branch
  • Select a Process Step from the drop down list
  • Enter the Duration or time required for the step as well as any Setup and Breakdown time
  • Enter the Sequence Number if more than one step or if not leave the Default value