18 Assigning Steps
From TrueERP wiki
Assigning Steps
How do you add a Process Step to a Sub-Branch?
Each item in a BOM must have its own branch with its own process steps and input types. A branch can be off the main tree or it can be a branch off a branch (sub-branch)
- To Add a Process Step select the Manufacturing Tab
- Select theProcess Steps field in the Sub-Branch
- Select a Process Step from the drop down list
- Enter the Duration or time required for the step as well as any Setup and Breakdown time
- Enter the Sequence Number if more than one step or if not leave the Default value