Personal tools

16. Duration

From TrueERP wiki

Jump to: navigation, search

Duration

Duration- Where do you define the time lines and sequence for each Process?


From the Main Menu select Manufacturing and then the Products Express List button.\

  • Select you product
  • Under the Manufacture tab you can create your BOM (Bill of Materials)
  • Under the Process column you can select a process you have previously created
  • On the Process Steps Edit screen you can enter the Duration, Setup, Breakdown, Sequence and Extra Info for your selected process step.

Note: If you select Assembly on your top line of the BOM the Sequence number should signify the last step it takes to produce your product. For example, if there are 8 steps to produce your product then Assembly would be number 8 in the sequence.